Speed
PEB members are fabricated while foundations are built, and site work is mostly bolting. Conventional RCC needs formwork, curing and sequential floors; site-fabricated steel needs cutting and welding in the field.
Spans and open floors
Steel portal frames give wide column-free spans easily. RCC buildings with similar spans need deep beams or many internal columns.
Flexibility
A PEB can be extended by adding bays, and can even be dismantled and re-erected. RCC structures are permanent and harder to modify.
Where RCC still wins
Multi-storey office blocks, residential buildings and structures needing heavy fire resistance or mass are often better in RCC or composite construction. Many industrial projects combine both — an RCC office block beside a PEB production hall.